Commercial work
Photographed on site
Full tear-off to bare joists, new rafters, plywood sheathing, and membrane roofing. Structural damage discovered during demolition required additional framing before the new roof system could be installed.
Full breakroom build-out inside an active warehouse. Tile flooring, cabinetry, quartz countertops, sink plumbing, and appliance installation — from framing to finished space.
Interior wall restoration inside a walk-in commercial refrigeration unit. Removed failed cork insulation, installed metal lath backing, and applied cementitious wall system rated for cold-storage environments.
Exterior site improvement along building perimeter. Weed barrier, gravel base, and decorative landscape boulders for a clean, low-maintenance finish that upgraded the property's street presence.